dc.description.abstract | Any complex large scale project consist a lot of activities, so it is very difficult to maintain schedule with standard quality. This paper presents a straight forward method to maintain quality without violating the minimum required time. Firstly, exemplify Critical Path Management (CPM) schedule from the multifaceted project by selecting parallel activities. Secondly, it represents the technique of control project standard by sampling attributes, and finally, compares the testing results by sampling attributes and those of from Normal distribution method. | en_US |
dc.language.iso | en_US | en_US |
dc.publisher | Vidyasagar University , Midnapore , West-Bengal , India | en_US |
dc.relation.ispartofseries | Journal of Physical Science;Vol 15 [2011] | |
dc.title | A Quality Control Approach Based on CPM Scheduling | en_US |
dc.type | Article | en_US |
Appears in Collections: | Journal of Physical Sciences Vol.15 [2011] |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
M15Art15.pdf | 193.17 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.